KONSTRUKCE Media, s. r. o.Com4In Group
ISSN 1803-8441
English - Google Translate Česky - Překladač Google French - Google Translate Italian - Google Translate German - Google Translate Polish - Google Translate Spanish - Google Translate Swedish - Google Translate   |   Přihlásit se   
Nacházíte se:  Úvod    Informace o autorovi - Stampler Johann

Stampler Johann

Články tohoto autora:

Consistent Analysis Method For Long Term Effects In Composite Bridges

Publikováno: 26.10.2010

Composite structures are widely used in bridge engineering, mostly combining steel girders with a cast in place concrete slab. Long-term effects due to creep and shrinkage of the concrete together with the specific structural behaviour make it imperative that appropriate techniques be used in the design and analysis process for considering these effects in accordance with sufficiently accurate theories....

Celý článek zde
  • <<
  • <
  • 1
  • >
  • >>

Server Vodohospodářské stavby

Rekonstrukce Vodního díla Nechranice

Rekonstrukce Vodního díla Nechranice