Janjic Dorian
Články tohoto autora:
Consistent Analysis Method For Long Term Effects In Composite Bridges
Publikováno: 26.10.2010
Composite structures are widely used in bridge engineering, mostly combining steel girders with a cast in place concrete slab. Long-term effects due to creep and shrinkage of the concrete together with the specific structural behaviour make it imperative that appropriate techniques be used in the design and analysis process for considering these effects in accordance with sufficiently accurate theories....
Celý článek zdeCelkem záznamů: 1
- <<
- <
- 1
- >
- >>







